Read an interior BOQ one line at a time: description, specification, quantity, unit, rate and inclusions. A correct total does not establish that every required item has been priced.
This guide checks an illustrative six-line wardrobe quotation and highlights possible omissions or double charges.
What Is a BOQ in Interior Design?
A bill of quantities, or BOQ, lists the work or products required for a project and their quantities.
A priced BOQ adds rates and amounts. It can help organise quotations, compare suppliers and track approved changes.
However, a document titled “BOQ” is not automatically complete.
For custom furniture, it should connect the quantities to drawings and specifications. Without those references, two carpenters may price different constructions against the same item name.
| Column | What it should tell you |
|---|---|
| Item reference | Which unit or work item is being priced |
| Description | What will be supplied or completed |
| Specification | Materials, finishes and other requirements |
| Unit | How the item is measured |
| Quantity | How much is included |
| Rate | Price for one stated unit |
| Amount | Quantity multiplied by rate |
| Remarks | Inclusions, exclusions and drawing references |
The Example: One Bedroom Wardrobe
Assume a homeowner wants a wardrobe with:
- External dimensions of 6 ft wide × 7 ft high × 2 ft deep.
- Hinged shutters.
- A specified plywood carcass and laminate finish.
- Internal shelves and hanging space shown on an approved drawing.
- Two internal drawers.
- No loft, mirror or internal lighting.
The selected materials, thicknesses and hardware models must be recorded in an attached specification schedule.
Illustrative Priced BOQ
| Ref. | Item | Unit | Quantity | Rate | Amount |
|---|---|---|---|---|---|
| W01 | Wardrobe carcass, shutters, shelves, hanging rod and specified finish | Sq ft of front elevation | 42 | ₹1,100 | ₹46,200 |
| W02 | Internal drawer box, excluding runners | Each | 2 | ₹1,500 | ₹3,000 |
| W03 | Specified drawer runners | Pair | 2 | ₹1,200 | ₹2,400 |
| W04 | Specified shutter handles | Each | 4 | ₹300 | ₹1,200 |
| W05 | Delivery and handling to the room | Job | 1 | ₹2,000 | ₹2,000 |
| W06 | Installation and final adjustments | Job | 1 | ₹3,000 | ₹3,000 |
| Subtotal before applicable taxes | ₹57,800 |
These are invented figures for explaining a quotation. They are not market rates, a recommended construction specification or an actual contractor offer.
For this example, W01 includes the specified hinges and routine fabrication consumables. Those inclusions should appear in the written quote.
Line W01: What Does the Main Wardrobe Rate Cover?
The main item contributes most of the cost, so start here.
The description should identify the cabinet body, shutters, shelves, hanging rod and finish. It should also reference the drawing and material schedule.
Ask:
- Which manufacturer and board product will be used?
- What are the carcass, shutter and back-panel thicknesses?
- Which laminate is included inside and outside?
- How many shelves and partitions are included?
- Are hinges, edge finishing and exposed side finishes covered?
- Does the quoted depth match the drawing?
“Plywood wardrobe with laminate” leaves several of these questions unanswered.
Check the Quantity
The example uses front elevation pricing:
6 ft width × 7 ft height = 42 sq ft
Then:
42 sq ft × ₹1,100 = ₹46,200
This confirms the arithmetic. It does not confirm the construction or material quantity.
The wardrobe requires more than 42 sq ft of board because it also contains sides, shelves, partitions and other components.
Do not interpret the chargeable elevation area as the plywood purchase quantity.
Line W02: Are the Drawers Included or Additional?
The example charges separately for two drawer boxes.
Check that the main wardrobe rate does not already include those same drawers. Otherwise, the quotation may count them twice.
Confirm:
- Internal or external drawer dimensions.
- Board and bottom-panel specification.
- Finish.
- Whether a separate drawer front is required.
- Whether runners, handles and locks are included.
A quote stating “two drawers” can refer to a complete fitted assembly or only the boxes. The description needs to say which.
Line W03: What Does “One Pair” of Runners Mean?
The example includes two pairs of drawer runners: one pair for each drawer.
The quotation should identify the exact model or agreed product series, length and operating features.
Check whether the supplied set includes any required brackets, locking devices or other components.
Do not rely on a brand name alone. The carpenter should confirm that the selected fittings suit the drawer construction, dimensions and intended contents.
If the quote uses “set” instead of “pair,” ask what that set contains.
Line W04: Do Handle Quantities Match the Drawing?
The example includes four shutter handles.
Compare that quantity with the approved shutter arrangement. Check the model, finish, size and fixing centres.
For handle-free designs, identify what replaces the handle:
- A recessed finger pull.
- An aluminium profile.
- A shaped shutter edge.
- A push-to-open mechanism.
These are different solutions with different construction requirements.
Also check loft handles separately if a loft is added later.
Line W05: Where Does Delivery End?
“Delivery included” may not explain the complete route to your apartment.
The example specifies delivery and handling to the room. Confirm whether that includes:
- Loading and transport.
- Unloading at the building.
- Lift or stair handling.
- Carrying panels into the apartment.
- Packaging removal.
Provide the vendor with building access information before accepting the amount.
If handling charges depend on lift availability or floor level, record the assumption. Avoid discovering those conditions when the vehicle arrives.
Line W06: What Counts as Installation?
Installation should identify the work required to turn delivered components into the completed unit.
For this example, ask whether it includes:
- Assembly and fixing.
- Agreed fillers and closing panels.
- Hardware fitting.
- Shutter and drawer adjustment.
- Protection of nearby finishes.
- Removal of installation debris.
- Final inspection and correction of installation defects.
Wall repairs, electrical changes or dismantling an existing wardrobe may fall outside this scope. If required, price them separately.
Do not add an installation line to a quotation that already includes the same work in the main furniture rate.
Check the Subtotal, Taxes and Final Payable Amount
The example subtotal is:
₹46,200 + ₹3,000 + ₹2,400 + ₹1,200 + ₹2,000 + ₹3,000 = ₹57,800
Next, check:
- Whether prices are tax-inclusive or tax-exclusive.
- Which applicable taxes are being charged.
- Whether a discount applies to all items or selected lines.
- Whether any provisional amounts remain.
- Whether delivery and installation have already been included.
Ask for the final payable amount in writing.
A quotation that says “taxes extra” without completing the calculation is not yet a complete payment figure.
Identify Fixed Prices, Allowances and Provisional Quantities
Not every number in a quotation has the same status.
| Pricing status | Meaning to clarify |
|---|---|
| Fixed amount | Agreed price for a defined scope |
| Estimated quantity | Quantity may change after measurement |
| Allowance | Budget provision for an item not yet selected |
| Provisional sum | Amount reserved for work not fully defined |
| Optional item | Excluded unless separately approved |
For example, “handles allowance: ₹1,200” is different from a fixed price for four selected handles.
Ask how differences will be calculated and approved. If a quantity will be remeasured, establish the measurement method and rate beforehand.
An allowance is not a promise that every product you select will fit within it.
Read the Exclusions Before Approving the Total
For the example wardrobe, exclusions might include:
- Loft.
- Mirror.
- Internal lighting and electrical work.
- Removal of existing furniture.
- Repairs to damp or damaged walls.
- Painting outside the agreed furniture scope.
An exclusion is not necessarily unreasonable. The issue is whether you need the excluded work to complete the room.
Add required exclusions to your overall budget before deciding that the quotation is affordable.
Keep Payment Terms Separate From Work Quantities
The BOQ explains what is being priced. The payment schedule explains when money becomes due.
Confirm:
- Advance payment.
- Design and specification approval stage.
- Material or manufacturing milestones.
- Delivery and installation milestones.
- Final payment conditions.
- Treatment of changes or cancelled items.
Record payments against invoices or receipts. Do not confuse the remaining payment balance with the value of unfinished work.
A clear final reconciliation should show the original agreed price, approved additions, agreed deductions, applicable taxes and payments already made.
Use the Same BOQ to Compare Carpenters
Send the same drawing, specification schedule and item list to each shortlisted carpenter.
Ask them to:
- Price every required line.
- Identify included items clearly.
- Mark exclusions.
- List proposed substitutions separately.
- State the complete payable amount.
- Confirm quotation validity and completion commitments.
Do not enter zero against an unanswered line. Mark it “confirmation required.”
A cheaper quotation may simply leave more work unpriced.
What Should You Have Before You Sign?
Your approval pack should contain:
- The final quotation version.
- Approved drawings.
- Material and hardware specifications.
- Confirmed quantities and measurement basis.
- Inclusions and exclusions.
- Payment and completion terms.
- A written process for approving changes.
Frequently asked questions
What is the difference between a BOQ and a quotation?
A BOQ organises work items and quantities. A quotation states the supplier’s offered prices and commercial terms. A priced BOQ can form part of a quotation.
Does a detailed BOQ guarantee that nothing will cost extra?
No. Site conditions, approved changes and provisional items can affect the total. Clear specifications and exclusions make those possibilities easier to identify.
Why are drawers sometimes charged separately?
Some vendors include a defined internal arrangement in their base rate; others price drawers separately. Check that the same component is not charged twice.
Should an interior BOQ include material brands?
Where a specific product is required, record the manufacturer, product, grade, thickness and relevant code. “Premium material” is not a precise specification.
Can I compare two BOQs using only their final totals?
Only after checking that the dimensions, materials, hardware, quantities and services match. Otherwise, the totals may represent different work.
What should I do if the final invoice differs from the BOQ?
Request a reconciliation identifying approved additions, deductions, quantity changes and taxes. Compare it with written approvals and the work actually supplied.
Plan your next steps with Houspire
Use Houspire to explore design support for your room before committing to purchases. Confirm the selected package’s views, drawings, revisions and exclusions; have your execution team verify site measurements and construction details.
For related guidance, read what a BOQ should contain and working with your own carpenter.